Knock down rebuild

Knockdown Lower Plenty

Friday, April 28, 2023
Works are well underway at one of our Lower Plenty projects with the slab preparation going full steam ahead.
read more

Builder Templestowe Lower

Friday, March 17, 2023
One of our Templestowe Lower projects was on a large slope so we decided to do a raft slab on this one. The concrete needed to be pumped down the slope so here it is getting ready to pour some footings.
read more

Knock down rebuild Templestowe 2

Tuesday, March 31, 2015
Access issues at many knock down rebuild sites are often a problem faced by builders. In this particular case, overhead wiring was directly where we needed to get our concrete pumped from, so we decided to use a line pump in lieu of the often used boom crane pump.
read more